11th Civil Engineer Squadron equipment operators push snow off the flight line at Joint Base Andrews, Md., Jan. 23, 2014. The equipment operator’s daily mission stops when snow comes down and they switch over from normal eight to continuous twelve-hour shifts until the flight line is snow and ice free. (U.S. Air Force photo / Airman 1st Class Nesha Humes)