HomeNews
Results:
Tag: no heat no cool

Oct. 10, 2019

'No Heat, No Cool' fall 2019

JOINT BASE ANDREWS, Md. -- The 11th Civil Engineer Squadron will initiate an installation-wide "No Heat/No Cool" period to assist them in switching heating, ventilation and air conditioning units from cooling to heating modes.The start date for this period will be Oct. 15, 2019 with an anticipated completion date of Nov. 30, 2019 or later weather

March 27, 2018

'No Heat, No Cool' spring 2018

The 11th Civil Engineer Squadron will initiate an installation-wide "No Heat/No Cool" period from April 18 to May 15, 2018 to enable the switching of heating, ventilation and air conditioning systems from heating to cooling modes.

Oct. 3, 2016

HVAC Seasonal Changeover (Heating)

The 11th Civil Engineer Squadron will initiate an installation-wide "No Heat/No Cool" period to assist them in switching heating, ventilation and air conditioning units from cooling to heating modes. The start date for this period will be Oct. 15 with an anticipated completion date of Nov. 15 or later, weather permitting. During this "No Heat/No